Mt. Sta. Rita | SubicNewsLink

Showing posts with label Mt. Sta. Rita. Show all posts
Showing posts with label Mt. Sta. Rita. Show all posts

17 April 2021

SBMA warns illegal settlers

The Subic Bay Metropolitan Authority (SBMA) on Thursday appealed to farmers and indigenous Ayta tribesmen to stop encroaching in government-administered land and clearing forests and building illegal settlements within the Subic Bay Freeport Zone.

SBMA Chairman and Administrator Wilma T. Eisma said the intrusion and introduction of unauthorized settlements violate the law, as well as an agreement between the Subic agency and the Ayta tribe on the use and disposition of tribal ancestral lands within the Freeport.


SBMA workers start dismantling a hut built in an illegally-cleared area near the Subic Bay Expressway












“Mapapagod lang po kayo sa paglilinis ng mga lupain at pagtatayo ng mga dampa kung labag naman sa batas ang inyong ginagawa. Babaklasin lang po ng mga may awtoridad ang inyong ginawa (Your efforts in clearing land and building shacks will simply be wasted if you’re activities are illegal. The authorities will simply dismantle what you build),” Eisma said.

“Matagal na pong may kasunduan tungkol sa mga lupaing katutubo dito sa Subic Freeport, at sana po ay sundin natin ito upang maiwasan ang kaguluhan (There has long been an agreement on the ancestral domain here in the Subic Freeport, and we hope you would honor it to avoid any problem),” she added.

Eisma also said the SBMA may be constrained to file legal cases against illegal settlers in order to protect government interest over the properties. 

The SBMA chief issued the warning following the discovery of two new illegal settlements at the Tipo area of the Subic Bay Freeport near the Mt. Sta. Rita Naval Link Station and the Subic Bay Expressway (SFEX). Tipo, which is the location of the eight-kilometer SFEX and some industrial park projects, is a village within Hermosa, Bataan, and adjoins Dinalupihan town and Brgy. New Cabalan in Olongapo City.

Some of the structures built by illegal settlers at Lot 2 near Mt. Sta. Rita in the Subic Bay Freeport

A report from the SBMA Ecology Center said that in late February, inspectors discovered an undeveloped settlement near the SFEX tunnel, which consisted of some huts built in a newly-cleared 500-square meter area. The new clearing is located along the proposed rail alignment of the Subic-Clark Railway Project, said SBMA Ecology Center manager Amethya Dela Llana.

Dela Llana said that after a meeting with the Kalayaan Ayta community revealed that the unauthorized clearing was made by a group of tribesmen from the Iram Resettlement area in Olongapo City, her office referred the matter on March 31 to Nestorio Pablo, the indigenous people’s representative to the Olongapo City council.

The notice sent to Pablo said that the SBMA will demolish the huts and confiscate the felled bamboos, wood, and other building materials found in the area.

Eisma said the demolition was carried out last Tuesday, April 13, by SBMA workers backed by officers from the SBMA Legal Department and the SBMA Law Enforcement Department.

She said the SBMA also served a “notice to vacate” to farmers who have started a new settlement at Lot 2 near Mt. Sta. Rita. The notice was received on Monday by Wilson Villas, vice chairman of the group Filipino Farmers Center Internazionale (FFCI).

Eisma said that while the Lot 2 settlement was still uninhabited, some semi-concrete structures put up by the illegal settlers there point to an intent for permanent occupancy.

The SBMA chief pointed out that the SBMA has already filed in court a case against illegal settlers consisting of about 30 families affiliated with FFCI who have occupied Lot 12, an area at the boundary of the Subic Freeport and the Roosevelt National Park in Dinalupihan.

She said the SBMA gave the FFCI five days to remove their belongings at Lot 2 and leave the area. (MPD-SBMA)

PHOTOS:

[1] SBMA workers start dismantling a hut built in an illegally-cleared area near the Subic Bay Expressway

[2] Some of the structures built by illegal settlers at Lot 2 near Mt. Sta. Rita in the Subic Bay Freeport

17 August 2015

EPI to build multibillion wind, solar projects in Subic

EMERGING Power, Inc. (EPI), a renewable energy company, will be putting up multibillion-peso wind and solar power projects at the Subic Bay Freeport Zone in line with its expansion from geothermal to solar and wind power.

The Subic Bay Metropolitan Authority (SBMA) has approved the entry of EPI into local company Jobin-SQM Inc. (JSI) via the acquisition of a 90 percent stake in the latter, SBMA acting deputy administrator Ronnie R. Yambao said.

The SBMA is the operating and implementing arm of the government for the development of a 670 square kilometer area of Subic Bay Freeport (SBF) into a self-sustaining tourism, industrial, commercial, financial, and investment center to generate employment opportunities.

In 2014, JSI president Nancy Tan signed a 50-year lease agreement with SBMA chairman Roberto Garcia for the development of a wind and solar project on an 800-hectare property on Mt. Sta. Rita, about 8 kilometers away from Olongapo City.

JSI has energy service contracts for 100 megawatts (MW) of solar power and 50 MW of wind power granted by the Department of Energy (DOE).

The Mt. Sta. Rita solar project, worth $200 million, is expected to be operational by June 2016 and is seen to reduce coal consumption by 44,300 tons per year.

A feasibility report by JSI released in March 2015 showed that the site is a suitable location for a solar energy facility that can produce up to 100 MW of power.

The report cited “convenient traffic, superior geographic position and rich solar energy resources” as factors proving the viability of the project.

It said the project meets the increasing demand for energy of the emerging Freeport Zone, while also speeding up the area’s economic and social development.

EPI chairman Antonio Martin Zamora said the project will pave the way for bringing clean and renewable power to SBMA.

“What better way to spark progress and growth to the people of Subic and investors in the country’s first freeport than by making clean and stable power available to them?” said Zamora.

Nickel Asia Corporation (NAC), one of the country’s biggest mining firms, holds a majority share in EPI.

NAC has said in a recent disclosure that it will guarantee the loan facility of EPI for up to P3 billion over a three-year period to finance EPI’s renewable energy projects.

NAC said it has earmarked $60 million for the purchase of JSI and Phase 1 of the project, which will initially be able to generate up to 25 MW of solar power.

EPI is also putting up a 40-MW geothermal power company in Oriental Mindoro, a 10-MW solar project in Camarines Sur, a 2.5-MW biogas project in Quezon; and a 10-MW solar and bunker hybrid project in Northern Palawan. (Ritchie A. Horario, Manila Times)

http://www.manilatimes.net/epi-to-build-multibillion-wind-solar-projects-in-subic/209576/