NLEX | SubicNewsLink

Showing posts with label NLEX. Show all posts
Showing posts with label NLEX. Show all posts

20 February 2021

New Subic Freeport Expressway now open

An NLEX Corporation bus breaks the ceremonial ribbon during the formal opening of the newly completed 8.2-km Subic Freeport Expressway (SFEX) on Friday, Feb. 19.


The 8.2-kilometer expansion project for the Subic Freeport Expressway (SFEX) that was designed to provide better, faster and safer access to the Subic Bay Freeport Zone was formally opened on Friday, Feb. 19, by the project developer and high-ranking government officials.

The project, which began in July 2019, was inaugurated by Executive Secretary Salvador Medialdea, Public Works Secretary Mark Villar, Transportation Secretary Arthur Tugade, Presidential Spokesperson Harry Roque, Subic Bay Metropolitan Authority (SBMA) Chairman and Administrator Wilma Eisma, Metro Pacific Investment Corporation (MPIC) President Jose Ma. Lim, Metro Pacific Tollways Corporation (MPTC) President Rodrigo Franco, and NLEX Corp President J. Luigi Bautista.

Bataan 2nd District Representative Joet Garcia, Hermosa, Bataan Mayor Jopet Inton, and MPTC spokesperson Romulo Quimbo Jr. were also present in the occasion.

The expressway project, which was touted to further accelerate economic growth in the Subic Bay Freeport and surrounding communities, was built at a cost of P1.6 billion.

Chairman Eisma, who welcomed guests in the inauguration rites, acknowledged the heavy support of the national government in Subic’s development as a premier investment and tourism center and said that the project is another testament of President Duterte’s “strong support and love for the Subic Bay Freeport Zone.”

Eisma thanked Medialdea and the other top officials in the Duterte Cabinet for further pushing development here.

She also requested support for a proposed interchange that will benefit three industrial parks at the Tipo area, pointing out that these industrial projects signal the continued trust of foreign investors in the Philippines under the Duterte administration.

Top-ranking government officials led by Executive Secretary Salvador Medialdea, Public Works Secretary Mark Villar, Transportation Secretary Arthur Tugade, Presidential Spokesperson Harry Roque, and SBMA Chairman Wilma Eisma headlined the opening of the newly completed 8.2-km Subic Freeport Expressway (SFEX) on Friday, Feb. 19.


The SFEX capacity expansion project entailed the construction of two additional expressway lanes, two new bridges at Jadjad and Argonaut Road, and a new two-pane tunnel.

NLEX Corporation President Bautista said this will increase road capacity from one lane in each direction to two lanes in each direction, and thus will accelerate business activities and facilitate the flow of goods and services in and out of Subic.

“One of the key drivers of economic growth is a network of high-quality roads. The NLEX Corporation through NLEX, SCTEX, and the soon-to-be expanded SFEX not only intends to accelerate development, but also hopes to encourage travel convenience and road safety,” Bautista added.

Meanwhile, Presidential Spokesperson Harry Roque described the SFEX expansion as one of the key projects under President Duterte’s Build-Build-Build program and a testament that, under the Duterte Administration, the government is working non-stop to provide essential services to the people.

Thanking the MPTC for initiating the project, Roque said the SFEX expansion has significantly hastened travel from Manila to the Subic Freeport and provided motorists an alternative and faster route in and out of the Subic Bay Freeport Zone.

The SFEX, which is also known as the Subic-Tipo Expressway or NLEX Segment 7, connects the Subic Bay Freeport to the 94-kilometer Subic-Clark-Tarlac Expressway (SCTEx), which in turn links with the Tarlac-Pangasinan-La Union Expressway. (MPD-SBMA)

PHOTOS:

[1] An NLEX Corporation bus breaks the ceremonial ribbon during the formal opening of the newly completed 8.2-km Subic Freeport Expressway (SFEX) on Friday, Feb. 19.

[2] Top-ranking government officials led by Executive Secretary Salvador Medialdea, Public Works Secretary Mark Villar, Transportation Secretary Arthur Tugade, Presidential Spokesperson Harry Roque, and SBMA Chairman Wilma Eisma headlined the opening of the newly completed 8.2-km Subic Freeport Expressway (SFEX) on Friday, Feb. 19.

30 December 2020

Opening of new SFEX lanes to ease traffic in Subic

Public Works Sec. Mark Villar, flanked by SBMA Chairman and Administrator Wilma T. Eisma and NLEX Corp. president and general manager J. Luigi Bautista, walks along the new lanes of the Subic Freeport Expressway past the new tunnel during the soft opening of the expanded expressway on Monday.

The temporary opening of the new lanes at the Subic Freeport Expressway (SFEX) will greatly ease heavier-than-normal movement of people and goods at the Subic Bay Freeport before and after the New Year festivities.

Subic Bay Metropolitan Authority (SBMA) Chairman and Administrator Wilma T. Eisma said the Subic agency is expecting more people to visit or pass through Subic for the holidays, at the same time that business locators transport more products in and out of the Freeport.

“The opening of the new lanes, albeit temporarily, is very timely,” Eisma said on Monday after Public Works Secretary Mark Villar led the ceremonial opening of the new SFEX lanes.

“It will ease the movement of people and goods in the Subic Bay Freeport and further develop Subic’s business and tourism prospects,” she added.

Eisma also said the SBMA had opened the Subic Freeport to tourists during the holidays subject to strict health safety protocols, and that tourist volume had increased dramatically to almost the current 50 percent full capacity.

She added that the Subic agency had allowed children to come into the Freeport as long as they stay in open areas or alfresco restaurants and not in malls and other closed spaces.

Public Works Sec. Mark Villar and SBMA Chairman and Administrator Wilma T. Eisma inspect project developments along  Subic Freeport Expressway














“There are lots of people coming in and Subic is very much excited, in a way,” Eisma said.

Villar, along with Eisma and NLEX Corp. president and general manager J. Luigi Bautista, graced the ceremonial drive-through at the new 8.2-kilometer expressway lanes to mark the temporary opening on Monday. The new lanes will be open temporarily until January 15, after which more construction activities will resume.

During the expressway drive-through, Villar expressed satisfaction at the expansion project and said the new Subic Freeport Expressway (SFEX) is already 92 percent complete, with the remaining portion being the construction of the Jadjad Bridge.

Villar said the P1.6-billion SFEX Capacity Expansion Project is expected to be fully completed in the first quarter of next year.

It entails the conversion of the Subic Freeport Expressway into a 2x2 divided expressway, with additional two lanes, two new bridges and a tunnel, as well as the installation of expressway-standard LED lights, raising the elevation of Maritan Highway-Rizal Highway-Tipo Road junction, and the enhancement of drainage systems for better flood management in the area.

Villar also noted that the project will enhance accessibility and promote travel efficiency along this key road that connects Bataan and Zambales, as well as boost Subic’s competitiveness as an ideal shipping gateway for Central and North Luzon.

The SFEX, which is operated by NLEX Corp., a toll road subsidiary of Metro Pacific Tollways Corp. (MPTC), connects the Subic Bay Freeport to the 94-kilometer Subic-Clark-Tarlac Expressway, which further links with the Tarlac-Pangasinan-La Union Expressway. (MPD/SBMA)

TOP PHOTO:

Public Works Sec. Mark Villar, flanked by SBMA Chairman and Administrator Wilma T. Eisma and NLEX Corp. president and general manager J. Luigi Bautista, walks along the new lanes of the Subic Freeport Expressway past the new tunnel during the soft opening of the expanded expressway on Monday.

15 September 2019

NLEX starts P1.6 B Subic Freeport Expressway works

Metro Pacific Tollways Corp. unit NLEX Corp. plans to complete in a year’s time the P1.6-billion capacity expansion of the Subic Freeport Expressway (SFEX) as construction activity goes full blast.

NLEX held a groundbreaking ceremony Thursday, September 12 for the 8.2-kilometer project aimed at improving traffic safety and easing travel time to and from the Subic Bay Freeport Zone.


Completion of the SFEX capacity expansion is targeted in September next year.

“One of the key drivers of economic growth is a network of high-quality roads. The NLEX Corp. through NLEX, SCTEX, and the soon-to-be expanded SFEX not only intends to accelerate development, but also hopes to encourage travel convenience and road safety,” NLEX president and general manager Luigi Bautista said.

The project will increase road capacity from one lane in each direction to two lanes each with the construction of two additional expressway lanes, together with two new bridges at Jadjad and Argonaut, and a new tunnel.

NLEX said the new bridges and the tunnel would be constructed parallel to the existing ones.

Also included in the project are the installation of expressway-standard LED lights as part of the tollway company’s efforts to improve motorists’ visibility when driving at night, the raising of Maritan Highway-Rizal Highway-Tipo Road junction, and the enhancement of the drainage system to help alleviate flooding in the area.

Once completed, the project will enhance accessibility and promote travel efficiency on the key road connecting Bataan and Zambales.

Subic Bay Metropolitan Authority (SBMA) chairman and administrator Wilma Eisma said the expansion project is expected to boost Subic’s competitiveness in trade and tourism industries.

“The project will help sustain Subic’s position as a globally competitive trade and tourism hub. This road expansion will complement SBMA’s infrastructure development program and promotion of Subic as an ideal shipping gateway for businesses in Central and North Luzon,” she said.

In line with the ongoing construction, NLEX committed to plant more trees to replace those affected by the road project. (Richmond Mercurio, Philippine Star)

PHOTO:

SBMA Chairman & Administrator Atty. Wilma T. Eisma (far right) along with NLEX and Local Government officials during the groundbreaking ceremony signaling the start of the SFEX expansion. (Photo from SBMA Chair & Administrator Facebook page)

https://www.philstar.com/business/2019/09/13/1951234/nlex-starts-p16-b-sfex-works#K4I02T62E9WSI75X.99

20 July 2019

P1.6-billion Subic expressway widening project underway

The P1.6-billion Subic Freeport Expressway (SFEX) Capacity Expansion Project is now on-going to further ease motoring in and out of this growing business and leisure hub.

Subic Bay Metropolitan Authority (SBMA) Chairman and Administrator Wilma T. Eisma said the North Luzon Expressway Corporation (NLEX), which operates the SFEX, is undertaking the expansion project designed to improve traffic flow in the area and promote road safety.


“It will also complement the SBMA’s infrastructure development program which includes widening of Freeport roads and improvement of our airport, seaport, and other logistics facilities,”Eisma said.

The SBMA official pointed out that the project also involves raising the Maritan Highway-Rizal Highway-Tipo Road junction by one or two meters, and fixing the drainage system in this area.

“This is the solution to the flooding problem that we have been experiencing in recent years,” Eisma said.

She said that with the start of the project on July 13, part of the Maritan-Rizal-Tipo junction will be closed to traffic and motorists will be redirected to alternate routes along the Causeway Road and the Argonaut-Kalayaan Access Road.

“I know this would exact some toll on the quality of work and leisure environment in Subic, as we have several infrastructure projects going on at the same time. But let us bear in mind that all these are meant to improve the business environment in the Subic Bay Freeport Zone,” Eisma said. “These are, in fact, our investments for a better future.”

According to NLEX Project Manager Elvin Cruz, the SFEX widening project entails construction of additional lanes to convert the 8.8-kilometer road into a four-lane highway.

This includes building new spans alongside the Jadjad and Argonaut bridges, and boring through the mountainside to create another two-lane tunnel beside the existing one.

Cruz said the first phase of the project is expected to be completed by October, in time for Subic’s hosting of 16 sports in the 2019 Southeast Asian Games to be held from November 30 to December 11.

The second phase, which will involve construction in the opposite lane, will start in January 2020.

Eisma said that Subic residents and visitors should expect “the usual dust, noise, and other small inconveniences” during project construction. “So I ask you to bear with us for 18 months until the whole project is completed,” she said.

“The pay-off to our patience will be a better road in and out of the Subic Bay Freeport, and we can then say goodbye to the heavy traffic that we occasionally suffer from during weekends when tourists flock to Subic,” she concluded.

The expressway widening project has been contracted out by NLEX Corp. to Sta. Clara International Corporation, a leading full-service engineering, construction, development and management enterprise in the Philippines which recently received a Quadruple A or “AAAA” license from the Philippine Contractors Association Board.

NLEX Corporation, which is the toll road subsidiary of Metro Pacific Tollways Corp., is the builder-concessionaire and operator of two major expressways that link Metro Manila to North and Central Luzon: North Luzon Expressway (NLEX) and Subic-Clark-Tarlac Expressway (SCTEX).

The SFEX, which is also known as the Subic-Tipo Expressway or NLEX Segment 7, connects the Subic Bay Freeport to the 94-kilometer SCTEX, which in turn links with the Tarlac-Pangasinan-La Union Expressway. (MPD/SBMA)

PHOTO:

Heavy machinery starts boring into the hillside to gouge out a new two-lane tunnel at the Subic Freeport Expressway. (BusinessMirror)

28 May 2019

20 new lanes to hike SCTEX toll capacity

NLEX Corp., the operator of the North Luzon Expressway and Subic-Clark-Tarlac Expressway, continues to conduct systematic repairs, upgrading and capacity expansion to ensure safe, reliable and seamless travel for the motoring public.

After rushing repair works on cracks and deformations on road pavements caused by the recent earthquakes that hit the Porac and Floridablanca portions of SCTEX in Pampanga, NLEX Corp. engineers are now focused on capacity expansion works.


Due to start in July is the construction of 20 additional lanes in various toll plazas along SCTEX, including vital construction at the Subic Freeport Expressway.

The additional toll plazas at SCTEX is aimed at improving the customer processing time at exit and entrance booths, the company said in a statement.

The toll plaza capacity expansion project, which is expected to be completed by November this year, covers Clark North, Clark South, San Miguel, Bamban, and Tarlac toll plazas.

One new toll lane each will be built in Clark North entry/exit and Clark South B exit. Two new toll lanes each will be added at Clark South A exit and Tarlac entry/exit to serve the growing number of motorists traveling in these areas.

NLEX Corp. will further increase the service capacity of San Miguel (Luisita) entry/exit plaza and convert it to a full interchange. This means that San Miguel will be more accessible to motorists, as those coming to and from San Miguel will now have complete entry and exit points from both northbound and southbound directions.

Meanwhile, two lanes each will be constructed at San Miguel northbound entry and southbound exit and another toll lane will be added to the northbound exit.

The soon-to-open Bamban Interchange will likewise have three entry and three exit lanes. The new interchange will become the direct connection to New Clark City, the main venue for this year’s Southeast Asian Games.

Luigi Bautista, president and general manager of NLEX Corporation, said “the additional toll lanes will help improve SCTEX’s connectivity in its areas, particularly in Clark, which is being positioned as Asia’s next aerotropolis and investment center.”

The new lanes aim to enable speedy toll transactions even during peak hours and holidays when traffic volume on the expressway rises sharply.

In previous years, the NLEX Corporation, together with the Bases Conversion and Development Authority, implemented several enhancement projects along SCTEX’s 94-kilometer stretch. These projects include the NLEX-SCTEX electronic toll collection integration, the expansion of Tipo Toll Plaza and the Mabiga Interchange.

CCTV System, LED lights, emergency call boxes, crash cushions, and reflective delineator plates were also installed at the expressway to enhance the safety of motorists. A new traffic control room was also built in Dolores, Mabalacat City to track real-time traffic at SCTEX.

The NLEX and SCTEX are safe for expressway users despite some pavement cracks observed in bridge approaches along SCTEX, following the 6.1-magnitude earthquake that seriously affected Pampanga and other parts of Central Luzon last April 22.

Meanwhile, post-earthquake assessment results conducted by NLEX Corp. and its engineering consultant AMH Philippines, showed there was no major structural damage found in NLEX-SCTEX bridges and slopes following the temblor, except for cracks and deformations on pavements and bridge expansion joints that were immediately repaired and are now 100% safe for expressway users.

NLEX and SCTEX bridges performed and behaved well and the cracks and deformations caused by the quake were all within anticipated range of structural-design assumptions. Comprehensive repairs have already been accomplished to ensure the riding comfort of motorists.

Repaired were four bridges in SCTEX Porac (Pasig-Potrero, Babo Pangulo, Planas, and Porac) and two bridges in SCTEX Floridablanca (Caulaman and Gumain) that sustained minor pavement cracks while steel plates and expansion joints that became uneven were now levelled.

“Our Quick Response Teams are on 24-hour stand-by mode and ready to immediately assist motorists to assure the safety of the public plying our expressways,” Bautista noted.

New expressway lanes, bridges, and tunnel will also be constructed at the Subic Freeport Expressway as the NLEX Corporation and Sta. Clara International Corporation recently signed the agreement for the P1.6-billion SFEX Capacity Expansion Project.

The project ― which involves the construction of two additional expressway lanes, two new bridges at Jadjad and Argonaut, and a tunnel ― aims to better accommodate the growing number of vehicles going in and out of the Subic Bay Freeport.

In addition, expressway-standard LED lights will be installed to keep the SFEX safe and convenient for motorists, particularly for those driving at night.

The SFEX Capacity Expansion is seen to improve traffic in the area and promote road safety as the new lanes will segregate northbound and southbound motorists along separate carriageways. It will also complement the Subic Bay Metropolitan Authority’s infrastructure development program which includes the improvement of airport and seaport, the widening of roads, and the construction of an SBMA Corporate Center.

Bautista said their structures, including those elevated ones, were designed and built in such a way that they do not collapse during an earthquake. He also stressed that the NLEX Harbor Link Segment 10, the elevated expressway from Karuhatan, Valenzuela City to Caloocan Interchange in C3, Caloocan City, is earthquake-resistant and can withstand high magnitude quakes.

“Rest assured that our roads adhere to world-class standards as we use top grade materials and undertake regular road condition surveys,” he added. (Orlan L. Mauricio, Manila standard)

http://manilastandard.net/lgu/luzon/295744/20-new-lanes-to-hike-sctex-toll-capacity.html

23 May 2019

P1.6-billion deal signed for expansion of Subic Freeport Expressway

A plan to expand the capacity of the Subic Freeport Expressway (SFEX) by building new expressway lanes, bridges, and tunnel has been finalized.

This, after the NLEX Corporation and Sta. Clara International Corporation recently signed the agreement for the P1.6-billion SFEX capacity expansion project, marking the start of realizing the expansion.


Under the P1.6-billion project fund, construction of two additional expressway lanes, two new bridges at Jadjad and Argonaut, and a tunnel will be implemented.

These additional infrastructure projects aim to better accommodate the growing number of vehicles going in and out of the Subic Bay Freeport.

The officials said expressway-standard LED lights will be installed to keep the SFEX safe and convenient for motorists, particularly for those driving at night.

They further said that the SFEX capacity expansion will improve traffic in the area and promote road safety as the new lanes will segregate northbound and southbound motorists along separate carriageways.

It will also complement the Subic Bay Metropolitan Authority’s (SBMA) infrastructure development program which includes the improvement of airport and seaport, the widening of roads, and the construction of an SBMA Corporate Center.

The contract signing was spearheaded by NLEX Corporation president and general manager Luigi Bautista, NLEX Corporation chief operating officer Raul Ignacio and Sta. Clara International Corporation chairman and managing director Nicandro Linao.

Other signatories to the contract are NLEX Corporation chief finance officer Ma. Theresa Wells and Sta. Clara International Corporation deputy managing director Fernando Delgado, with Transportation consultant Alberto Suansing as witness. (Betheena Unite, Manila Bulletin)

PHOTO:

The familiar Tipo tunnel at the Subic Freeport Expressway (SFEx) also known as the Subic-Tipo Expressway.

https://news.mb.com.ph/2019/05/21/p1-6-billion-deal-signed-for-expansion-of-subic-freeport-expressway/



24 April 2019

NLEX spending P1.6b to expand toll road in Subic

NLEX Corp. said it is spending P1.6 billion to expand the capacity of Subic Freeport Expressway, or SFEx, amid growing vehicle traffic.

NLEX vice president for project management Nemesio Castillo said SFEx, or the Tipo section of the Subic-Clark-Tarlac Expressway to Subic Bay Metropolitan Authority, would be expanded by one lane in each direction.

The Subic-Tipo Tunnel of the Subic Freeport Expressway (SFEx)

The project is expected to be completed in 16 months starting this month.

Castillo said a new tunnel and two new bridges—Jadjad Bridge and Argonaut Bridge—would also be constructed while expressway-standard LED lights would be installed to keep the expressway safe for motorists, especially for those driving at night.

SFEx, which was constructed in time for the Asia Pacific Economic Cooperation meeting in Subic in 1996, is now a part of SCTEx.

NLEX holds the concession to manage, operate and maintain SCTEx, a 93.77-km four-lane highway, traversing the provinces of Bataan, Pampanga and Tarlac.

The management, operation, and maintenance of SCTEX was turned over by BCDA to the NLEX in 2015.

NLEX said last week it allotted P400 million this year to expand the capacity of SCTEX.

The company, which operates SCTEX, said more lanes would be built in Clark South A and South B exits; Clark North entry and exit; San Miguel northbound entry and exit; and Tarlac entry and exit.

NLEX said the construction would start on July 1 this year and be completed by November this year.

The construction of the Bamban Interchange, which will link the expressway to New Clark City, is also ongoing in time for country’s hosting of the Southeast Asian Games.

Data show since the SCTEx was opened in 2008, the average daily traffic grew by close to 600 percent from just 9,302 to 62,643 in 2018. (Darwin G. Amojelar, Manila Standard)


http://manilastandard.net/business/corporate/292969/nlex-spending-p1-6b-to-expand-toll-road-in-subic.html

21 August 2017

NLEX to expand Subic Expressway

NLEX Corp. is spending over P2 billion to expand the Subic Freeport Expressway to accommodate growing vehicle traffic, a top executive said over the weekend.

NLEX president and chief executive Rodrigo Franco said SFEx or the Tipo section of the Subic-Clark-Tarlac Expressway to Subic Bay Metropolitan Authority would be expanded from 1x1 lane to 2x2 lanes in each direction.


“We are spending over P2 billion for the project but we are still calibrating that,” Franco said.

Franco said the investment proposal would be submitted to the Toll Regulatory Board by October, while construction was expected to start next year.

SFEx, which was constructed in time for the Asia Pacific Economic Cooperation meeting in Subic in 1996, is now a part of SCTEx.

NLEX holds the concession to manage, operate and maintain SCTEx, a 93.77-km four-lane highway, traversing the provinces of Bataan, Pampanga and Tarlac.

The company reported a net income of P2.3 billion in January to June, up 17 percent from last year’s P2 billion on higher toll revenues at North Luzon Expressway and SCTEx and efficient utilization of resources covering toll operations and maintenance costs.

NLEX said toll revenues increased 8 percent in the six-month period to P5.7 billion from P5.2 billion a year ago, led by the increase in traffic from both NLEx and SCTEx operations.

Average daily traffic along NLEx reached 233,652 daily entries in the first half, or 7 percent higher than the same period last year, while average daily traffic at SCTEx reached 54,991 daily entries, up by 24 percent from a year earlier.

NLEX earlier submitted an unsolicited proposal to build the P60-billion C5 Expressway, a 21.8-kilometer elevated toll road from the end of NLEX Segment 8.2 on Luzon Avenue, Quezon City to Cavitex C5 South Link.

The project will complete the missing segment of the C5 Circumferential Expressway alignment, a crucial component of the Metro Manila Urban Expressway Network. (Darwin G. Amojelar, Manila Standard)

PHOTO:
A portion of the Subic Freeport Expressway (SFEx)
(source: https://en.wikipedia.org/wiki/Subic%E2%80%93Tipo_Expressway)

http://manilastandard.net/business/banking-report/244950/nlex-to-expand-subic-expressway.html

20 May 2016

MNTC to invest P2B for SCTEx 2016 makeover

THE tollways arm of Metro Pacific Investments Corp. is investing P2 billion to implement a makeover program for the Subic-Clark Tarlac Expressway (SCTEx), making it at par with its sister, the North Luzon Expressway (Nlex).

The amount will be spread over a period of three years, Manila North Tollways Corp. (MNTC) President Rodrigo E. Franco said, and will help modernize the expressway.


“After SCTEx was turned over to us last year, we slated several modernization works all aimed at making the SCTEx at par with the Nlex,” he said.

At the top of the list are the recently completed integration of the two thoroughfares which amounted to P758 million, and the ongoing pavement improvement of the SCTEx from 2016 to 2018, which costs P1 billion.

The integration project unified the toll collection systems of the two expressways, thus continually creating a faster and seamless traveling experience for motorists going to and coming from the North.

The integration project also modernized SCTEx’s toll collection system by making available to SCTEx electronic-toll collection through EasyTrip.

The SCTEx pavement repair includes three-year asphalt overlay and road patching of the 94-kilometer expressway to make the SCTEx’s pavement as smooth as that of the Nlex.

Also part of the enhancement program is the installation of modern traffic and telecommunications systems worth P266 million.

Closed-circuit television (CCTV) cameras and emergency call boxes are currently being installed along the expressway to ensure the security of motorists. The roadside emergency-call boxes will aid distressed motorists to directly and quickly connect to the SCTEx traffic control room.

The CCTV cameras will enable real-time monitoring of the entire stretch of the expressway which, in turn, will allow expressway teams to respond faster to motorists who may need assistance.

Variable message signs that provide motorists with useful and updated traffic information are being put up along the expressway as well. These signs will be located in Concepcion, Tarlac, and Porac and Floridablanca, Pampanga.

To further guarantee the safety of motorists, high-risk slopes along the expressway are undergoing repair through slope restoration using gabions and geosynthetics reinforcements and adding drainage lines for P22 million.

MNTC has also allotted P47 million in capital expenditures for system and software, traffic devices and facility enhancements.

Toll booths in all SCTEx toll plazas are also up for rehabilitation which will include repainting and replacement of equipment.

“Once these improvements are fully implemented, our motorists can surely expect a smoother and safer travel at SCTEx,” Franco said.

The infrastructure giant is the largest toll-road operator in the Philippines. The conglomerate also has significant shareholdings in expressways in Vietnam and Thailand. (BusinessMirror)

http://www.businessmirror.com.ph/mntc-to-invest-p2b-for-sctex-2016-makeover/

08 April 2016

NLEX-SCTEX integration speed up traffic during the Holy Week

The recent integration of the NLEX and SCTEX greatly helped in managing the surge in traffic volume at the North Luzon Expressway (NLEX) and Subic Clark Tarlac Expressway (SCTEX) at the just concluded Holy Week exodus to Central and North Luzon.

The Manila North Tollways Corporation (MNTC) reported that motorists experienced light-to -moderate traffic flow through in the whole stretch of NLEX-SCTEX, except at the peak of the Lenten Season, last March 24 and 27 when traffic hit 275,000 and 260,000, respectively, when traffic became really heavy.

SCTEX portion going to Subic Bay Freeport (file photo)

MNTC traffic data indicated vehicle entries rose to 275,000 from 263,000 in 2015. “Without integration, this kind of vehicle volume could have created a worse traffic situation on the country’s two premier expressways.

“Travel to the North Luzon was a breeze this year with the integration of NLEX and SCTEX into one seamless road network. The decreased number of toll plaza stops to two made travel to the north faster and more convenient for motorists,” said MNTC president Rodrigo Franco.

The NLEX-SCTEX Integration unified the NLEX and SCTEX toll collection systems into a single system, reducing toll collection stops to two instead of five from Balintawak to Subic and back, instead of four from Balintawak to Tarlac and back.

The integration also introduced other payment option at SCTEX since it now features electronic toll collection through Easytrip.

“This was the first Holy Week that we had the NLEX and SCTEX integrated, more system improvements are on the way to further provide comfort and convenience to motorists,” said Franco.

Aside from the integration of the two expressways, MNTC also attributed the manageable traffic flow to the efficient traffic schemes.

“On Maundy Thursday, we implemented counter-flow in San Simon to address the traffic build-up caused by high volume of vehicles going to the provinces,” explained Franco, adding that “additional toll collection points at Bocaue Toll Plaza were in placed on Black Saturday and Easter Sunday to accommodate motorists returning to Manila.” (Manila Bulletin)

http://www.mb.com.ph/nlex-sctex-integration-speed-up-traffic-during-the-holy-week/

19 March 2016

NLEX, SCTEX integrated, eases northbound travel

CLARK, Pampanga, Philippines – The North Luzon Expressway (NLEX) and Subic-Clark-Tarlac Expressway (SCTEX) have been combined into one seamless road network to accommodate the heavy influx of motorists for the Holy Week.

Senate President Franklin Drilon led officials in a ceremonial drive yesterday to the Sta. Ines toll plaza, marking the launch of the combined tollways.

The integration of the two expressways cost P650 million and involved the conversion of the NLEX and SCTEX toll collection into a single system.

This reduces toll collection stops to two instead of five from Balintawak to Subic and back, instead of four from Balintawak to Tarlac and back.

To unify the system of NLEX and SCTEX, the Manila North Tollways Corp. (MNTC) has constructed seven new toll plazas in Tarlac, Subic-Tipo, Sta. Ines and the northbound and southbound side of Dau and Mabiga.

MNTC president Rodrigo Franco said the seamless and faster travel can now be experienced at NLEX and SCTEX as toll collection stops are lessened and additional options are introduced at the SCTEX.

Franco added the integration speeds up the queues on the toll plazas. Motorists who will drive from Manila to Subic will just have to stop for toll payments at Balintawak and Subic or Tarlac.

“This will save them up to 40 minutes of travel time,” he said.

Drilon said he had temporarily suspended his campaign sortie to savor the launching of the toll integration project.

Drilon recalled the plan for the two expressways to be integrated was brought about by the 11-hour traffic ordeal he had on the two expressways in 2014.

To spare motorists from experiencing a similar fate, Drilon said he summoned officials of the MNTC and the Bases Conversion Development Authority (BCDA) to find a solution to the traffic congestion in the two expressways.

Drilon noted the integration project also features a unified ticketing system, electronic toll collection and magnetic payment methods, which are projected to increase up to 800 transactions per hour compared to manual lanes which could only service 200 transactions per hour.

On the other hand, BCDA president and chief executive officer Arnel Paciano Casanova said the integration is a game-changer that will greatly benefit the motorists in terms of faster travel time and conveniences and set the standard for what is doable in the future.

Casanova said the NLEX-SCTEX integration is the first among expressways in the country.

With the integration completed, Franco added the MNTC is open to discussions to link NLEX to TPLEX, which is operated by San Miguel Corporation.

“That would be a natural next step to try to talk to the concessionaire or operator to see if that integration is possible, so that may be something we could eventually explore with the concessionaire of TPLEX,” Franco said.

For the Holy Week, MNTC will implement Safe Trip Mo Sagot Ko 2016 motorist assistance program to enhance traffic management and toll collection services at the NLEX, SCTEX and CAVITEX.

From March 18-28, additional patrol vehicles and enforcers will be fielded to immediately respond to distressed motorists while ambulant toll tellers equipped with portable toll collection gadgets will be deployed and additional traffic informatory signs will be installed in strategic areas and road works will also be suspended to ensure smooth traffic flow. (Louella Desiderio, The Philippine Star)

PHOTO:
Senate President Franklin Drilon leads the inauguration of the NLEX-SCTEX integration system at the Sta. Ines toll plaza in Pampanga yesterday.

http://www.philstar.com/headlines/2016/03/19/1564423/nlex-sctex-integrated-eases-northbound-travel

28 January 2016

NLEx-SCTEx integration nears completion, to cut tollway travel time

THE TOLLWAYS arm of Metro Pacific Investments Corp. (MPIC) said the P650-million project integrating the North Luzon Expressway (NLEx) and Subic-Clark-Tarlac Expressway (SCTEx), which will cut travel time from Balintawak to Subic by up to 40 minutes, is nearing completion.

The NLEx and SCTEx integration, which is currently 85% finished, is expected to be operational by March, as the firm braces for a surge in traffic volume during the Holy Week, Manila North Tollways Corp. (MNTC) Assistant Vice-President Glenn G. Campos reporters during an inspection of the project yesterday.

“The integrated system will be operational by March because we are expecting a 15%-20% surge in volume during the Holy Week,” he said.

Around 200,000 vehicles travel through the NLEx every day, while 35,000 pass thorough the SCTEx. The combined vehicular traffic is expected to increase 5%-7% this year, MNTC Senior Vice-President Raul L. Ignacio said at the same venue.

As part of the integration, the company is reducing toll collection stops, while toll plazas at Dau and Mabalacat are being converted to pass-through lanes.

Motorists can also start using the EasyTrip Tag on both tollroads. Around 20%-25% of NLEx’s motorists use the digital payment scheme, while all SCTEx users pay in cash.

“We are estimating [time] savings to be at 35 to 40 minutes,” Mr. Campos said. “If your travel time from Balintawak to Tarlac used to take one hour and 50 minutes, it will be reduced to one hour and 10 to 15 minutes.”

The company said toll rates will remain unchanged as the Toll Regulatory Board (TRB) has yet to act on its petitions for rate hikes.

Last Sept. 30, 2015, MNTC filed a petition with the TRB for toll rate adjustment and the inclusion of a 12% value added tax at the SCTEx. If granted, SCTEx toll rates would rise by P4.67 per kilometer (km) for Class 1 vehicles, P9.32 per km for Class 2 vehicles, and P13.97 per km for Class 3 vehicles.

MNTC had earlier said it is spending more than P1.5 billion to upgrade the SCTEx over the next three years, saying the upgrade will make it at par with the NLEx. (Daphne J. Magturo, BusinessWorld)

PHOTO:

SCTEX toll plaza at the Subic Bay Freeport Zone (AMD/MPD-SBMA)

http://www.bworldonline.com/content.php?section=Corporate&title=nlex-sctex-integrationto-be-completed-by-march&id=122211


19 January 2016

MPIC unit allocates over P1.5B for SCTEx upgrade

THE TOLLWAYS arm of Metro Pacific Investments Corp. (MPIC) is spending more than P1.5 billion to upgrade the Subic-Clark-Tarlac Expressway (SCTEx) over the next three years, saying the upgrade will make it at par with the North Luzon Expressway (NLEx).

“Aside from integrating the two tollways seamlessly, we have lined up a lot of enhancement works for SCTEx,” Rodrigo E. Franco, Metro Pacific Tollways Corp. (MPTC) president and chief executive officer, said in a statement yesterday.

MPTC is the holding company of Manila North Tollways Corp. (MNTC), which operates the two toll roads.

“These include pavement works, construction of new facilities, and the improvement of the toll collection and communications systems,” Mr. Franco said.

One the integration of the two tollways is completed this year, SCTEx will adopt NLEx’s modern toll collection system, which uses dedicated short-range communication tags, as well as contactless and magnetic cards.

“The MNTC is investing more than P1.5 billion to improve the SCTEX and bring to it all the world-class features of the NLEX. A three-year asphalt overlay project covering the entire 94-kilometer length of the expressway will eventually make the SCTEX’s pavement as smooth as that of the NLEX,” Mr. Franco said.

Motorists will start to feel the improvements during the Holy Week in March, when traffic volume is expected to surge.

The country’s longest four-lane expressway serves around 34,000 vehicles every day, generating an annual revenue of around P1.4 billion, MPTC’s immediate past president Ramoncito S. Fernandez said in November last year.

MPTC said it is installing closed-circuit television cameras and emergency call boxes along the toll road.

“The roadside emergency call boxes will enable distressed motorists to directly and quickly connect to the SCTEX traffic control room. The CCTV cameras, on the other hand, will enable real-time monitoring of the entire stretch of the expressway which, in turn, will allow MNTC teams to respond faster to motorists who may need assistance,” the company said.

There will be additional lights and reflectorized strips to guide motorists at night, variable message signs with updated traffic information, as well two additional restrooms at the Dolores Exit and Luisita Interchange.

“By Holy Week 2016, some physical barriers currently standing between the two tollways will be removed. Motorists will no longer need to stop at Dau and Mabalacat as these will be converted into pass-through lanes,” MNTC said.

The Bases Conversion and Development Authority, the state-run agency that built SCTEx, awarded last year to MNTC the contract to manage, operate and maintain the expressway until 2043.

The 94-kilometer SCTEx passes through the provinces of Bataan, Pampanga and Tarlac. It is linked to the northern tip of 93-kilometer NLEx at Sta. Ines in Mabalacat, Pampanga.

Shares in listed MPIC added four centavos or 0.78% to end Monday at P5.14 apiece.

MPIC is one of three Philippine units of Hong Kong-based First Pacific Co. Ltd., the others being Philippine Long Distance Telephone Co. (PLDT) and Philex Mining Corp.

Hastings Holdings, Inc., a unit of PLDT Beneficial Trust Fund subsidiary MediaQuest Holdings, Inc., has a majority stake in BusinessWorld. (Daphne J. Magturo, BusinessWorld)

PHOTO:
CARS are seen along the Subic-Clark-Tarlac Expressway. (file, bcda.gov.ph)

http://www.bworldonline.com/content.php?section=Corporate&title=mpic-unit-allocates-overp1.5b-for-sctex-upgrade&id=121675

30 March 2015

NLEX, SCTEX integrate to ease holy week traffic

Motorists using the two tollways, NLEX and SCTEX, during the Holy Week break will already experience the ease and convenience resulting from the integration of the toll systems.

“To handle the expected increase in traffic volume during Holy Week, we will pilot-test the integrated toll system to provide motorists with a foretaste of the smooth travel experience that the project, once completed, will bring about,” said Rodrigo E. Franco, president of the Manila North Tollways Corporation , builder and concessionaire of the expressway. “With the integration, travel through NLEX and SCTEX will be faster and more convenient.”

On April 1 and 2, northbound motorists exiting NLEX, except for those whose vehicles are equipped with Easytrip tags, will not have to stop and pay at the Dau Exit Toll Plaza. All manual lanes in the toll plaza will be designated as “pass thru” lanes. However, there will still be dedicated Easytrip lanes where payment stubs that serve as receipts will be given to motorists with Easytrip transactions.

At the Dau and Sta. Ines interchanges, temporary booths will be set up to collect toll from motorists exiting NLEX. On the other hand, motorists exiting NLEX and continuing on to SCTEX—either to Subic or Tarlac —will have to pay their combined NLEX and SCTEX toll at the SCTEX Mabalacat Entry Toll Plaza. Payment stubs and manual official receipts will be issued to motorists as proofs of payment.

In anticipation of the usual 20% increase in the expressway’s traffic volume during Holy Week, MNTC is putting up 20 additional booths in the area. And as an added treat to motorists going all the way from NLEX to SCTEX Subic or SCTEX Tarlac, they can buy Express Cards in any of the gas stations along NLEX that will entitle them to a toll discount.

Motorists traveling to SCTEX Subic or SCTEX Tarlac just need to surrender the payment stubs issued to them in Mabalacat or the Express Cards bought from NLEX gas stations when they exit the expressway.

On April 4 and 5, southbound motorists using NLEX will not need to stop at the Dau Entry Toll Plaza where all entry lanes will be designated as “pass thru” lanes. No transit tickets will be given out.

While traveling along the expressway, motorists can again buy Express Cards from any of the NLEX gas stations to entitle them to toll discounts. Toll payments as well as Express Cards will be collected at the Bocaue Toll Plaza. To speed up collection, 15 temporary toll booths will be installed.

“While this system is still temporary and just being set up for Holy Week, it will soon be a permanent fixture once the NLEX-SCTEX system integration is fully completed,” Franco said.

The agreement to integrate the two expressways’ toll systems was signed last January between MNTC and the Bases Conversion and Development Authority (BCDA), the government-owned and controlled corporation that built SCTEX.

The integration will bring to SCTEX the modern features of NLEX’s toll payment system. These include dedicated short-range communication, radio frequency identification (RFID) sticker tags, as well as contactless and magnetic cards.

Under the integration plan, some toll barriers and toll plazas will be removed or transferred. Among the barriers that will be removed are the NLEX Dau Barrier and the SCTEX Mabalacat Toll Barrier. New toll plazas will be constructed at the existing entry and exit ramps at NLEX Dau and Sta. Ines. A new SCTEX Tarlac Toll Plaza will also be constructed.

The project is expected to be completed within the year. (Manila Standard Today)

http://manilastandardtoday.com/2015/03/29/nlex-sctex-integrate-to-ease-holy-week-traffic/

06 February 2015

Nlex-SCTEx integration done by November

THE Manila North Tollways Corp. (MNTC) is aiming to complete the integration of the North Luzon Expressway (Nlex) and the Subic-Clark-Tarlac Expressways (SCTEx) by the fourth quarter this year, a senior official said.

This development came after the toll-road company and the Bases Conversion and Development Authority (BCDA) signed on Thursday the P650-million contract to link the two expressways, thereby making it faster for motorists to transfer from the Nlex) to the SCTEx and vice versa.

“Immediately after this signing, we will start the works. We are just waiting for the approval from the Toll Regulatory Board, but while waiting for that we’ll start the needed preparations,” MNTC President Rodrigo E. Franco said in an interview. “Our target is to complete the integration works by November.”

The integration of the two expressways would speed up the queues on the exit plazas of the Nlex and the SCTEx, increasing the amount of transactions per hour to 800 from the current 200.

“This would pave way for seamless travel between the two expressways, lessening the stops that motorists have to do in the current setup,” Franco said.

The toll-linkage project involves the conversion of separate Nlex and SCTEx toll-collection systems into a single system that should allow more efficient toll collection and faster movement of traffic for motorists.

It also involves the installation and removal of temporary plazas, and the construction of interchange plazas that will also require the widening of existing entry or exit ramps.

BCDA President and CEO Arnel Paciano D. Casanova said the integration would facilitate trade to and from three key economic zones of Central Luzon: the Subic Bay Freeport, the Clark Freeport Zone and the Central Techno Park in Tarlac.

“The actual integration may even be faster because MNTC will soon be awarded the contract for the SCTEx as well,” he said. “The BCDA board formally approved the toll-integration proposal, clearing all hurdles to toll integration from our end.”

The tollways arm of Metro Pacific Investments Corp. will soon take over the reins of the central expressway after the disposition agency failed to muster bids for the price challenge of the thoroughfare’s multibillion-peso operations contract.

The toll-road business of tycoon Manuel V. Pangilinan offered P3.5 billion to win the deal way back President Arroyo’s term. It also proposed a 50-percent revenue-sharing scheme.

President Aquino late last year directed the state-run asset-disposition agency to subject the offer of MNTC to a price challenge “in the interest of transparency and for competition.”

The 94-kilometer expressway allows for the merging of Clark and Subic Bay Freeport zones into a single facility resulting in the convergence of land-, air- and sea-based transport.

As of end-November 2014, the number of vehicles that used the toll road was at 10,305,688, a 12.93-percent increase compared to the 9,125,480 vehicles that used the toll road for the same period in 2013. It booked P1.07 billion in revenues during the period under review.

The Pangilinan group also operates the Manila-Cavite Toll Expressway. Its parent company, Metro Pacific Tollways Corp., has significant interests in toll roads abroad. (Lorenz S. Marasigan, BusinessMirror)

http://www.businessmirror.com.ph/nlex-sctex-integration-done-by-november/

21 January 2015

NLEX, SCTEX integration pushed

Senate President Franklin Drilon has set deadline on the Bases Conversion Development Authority (BCDA) and the Metro Pacific Tollways Corp. (MPTC) to approve and implement the integration of the North Luzon and Subic-Clark-Tarlac expressways to avoid travel dilemmas and inconvenience experienced by commuters from happening again, especially during peak seasons.

Drilon recently met with officials of the Department of Transportation and Communication, BCDA, MPTC, Toll Regulatory Board (TRB) and Manila North Tollways Corp. (MNTC) to iron out issues concerning the implementation of the integration plan for NLEX and SCTEX, which has been pending for years.

Drilon asked the officials to fasttrack the implementation of an integration plan, starting with the signing of the integration agreement scheduled on February 12 of this year.

“To expedite the process, the TRB will simultaneously monitor and review the toll collection systems integration agreement to make sure it will be in conformity with the policy of the government,” said Drilon.

He said the integration will simplify toll collection system and lessen the number of toll collection plazas.

“The integration of the NLEX and SCTEX toll systems will benefit commuters, especially in saving travel time and fuel and increasing convenience for those driving through the tollways,” Drilon said.

“The current setup is too complex and stands improvement. We cannot understand why we have to make five stops going to Subic and four stops going to Tarlac only to pay toll fees, when we can make things better and simpler by simply allowing commuters to pay their fares in full in only one toll plaza,” he added.

Given the dilemma faced by commuters especially during the holiday season, Drilon said it is only proper that changes are put in place, so that the public will not have to endure the same predicament over again.

Drilon said BCDA had informed him preparation will take seven to nine months to be finished, which will cover, among others, the removal of NLEX-Dau and SCTEX-Mabalacat barriers and deployment and commissioning of NLEX integrated toll collection system in all SCTEX and new NLEX toll plazas.

“With the system integration, motorists will no longer have to make several stops only to pay for fares. That means that everyone will soon only have to stop twice in paying tolls throughout NLEX and the SCTEX, as compared to the current situation where we have to stop five times just to pay our fares,” Drilon said.

At present, motorists have to make five stops just to pay toll fees in a trip to Subic. A motorist gets a transit ticket at NLEX entry point in Balintawak, and surrenders it and pays toll fees at NLEX Dau. He then gets a smart card at SCTEX Mabalacat and surrenders it and pays toll fees at SCTEX Tipo toll plaza, only to again pay new toll fees at Subic Freeport Expressway-Tipo.

Drilon said that the tollway authorities and relevant agencies must “exercise diligence” and hasten the reforms in the toll collection systems, given the expected surge of motorists and travellers in the Holy Week and summer season.

He said he is confident that authorities and companies involved in the management of NLEX and SCTEX will be able to introduce and agree on a new collection system to provide commuters seamless travel experience.

He concluded that this is only the first phase of the integration, as plans and discussions to make travel going to North more seamless and convenient are currently being done. These include the integration of NLEX and SCTEX with the Tarlac-Pangasinan-La Union expressway and the interoperability of the North and South expressways. (Malaya Business Insight)

http://www.malaya.com.ph/business-news/business/nlex-sctex-integration-pushed